trade leads
View Offers to Buy: Services - Repair/Maintenance - Boats - Other
 
19 -- 11 Meter Ribs boat Repair (OB1857921) (2007-02-05)

This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in
accordance with the format in FAR Subpart 12.6, as supplemented with the
additional information included in this notice. This announcement constitutes
the only solicitation; a written solicitation will not be issued. The RFQ
number is H92242-07 T-0007. This solicitation documents incorporates
provisions and clauses that are in effect through FAC 2005-14, dated 22
November 2006 and DFARS Change Notice 20050930. The DPAS Rating for this
solicitation is DO. It is the responsibility of the contractor to be familiar
with the applicable clauses and provisions. The clauses may be accessed in
full text at these addresses: http://farsite.hill.af.mil and
http://www.acq.osd.mil/dpap/dfars/index.htm . The NAICS code is 336611, the
Small Business Standard is $1,000 Mil. This is a competitive full and open
procurement. The Naval Special Warfare Group 4 requests responses from
qualified sources capable of providing: CLIN 0001 Quantity 1 Lot: Emergent
repairs and or upgrades to the 11 Meter Rib and Trailer number NS83 (Government
Facility ), CLIN 0002 Quantity 1 Lot: Emergent repairs and or upgrades to the
11 Meter Rib and Trailer number NS83 (Contractor's Facility ) CLIN 0003,
Quantity 1 Lot: Emergent repairs and or upgrades to the 11 Meter Rib and
Trailer number NS84 (Government Facility). CLIN 0004, Quantity 1 Lot:
Emergent repairs and or upgrades to the 11 Meter Rib and Trailer number NS84
(Contractor's Facility ) CLIN 0005 Quantity 1 Lot: Emergent repairs and or
upgrades to the 11 Meter Rib and Trailer number NS43 (Government Facility)
CLIN 0006 Quantity 1 Lot: Emergent repairs and or upgrades to the 11 Meter Rib
and Trailer number NS43 (Contractor's Facility ) and CLIN 0007 Quantity 1 Lot:
Emergent repairs and or upgrades to the 11 Meter Rib and Trailer number NS44
(Government Facility). and CLIN 0008 Quantity 1 Lot: Emergent repairs and or
upgrades to the 11 Meter Rib and Trailer number NS44 (Contractor's Facility).
Work shall be performed In accordance with the Statement of Work below. The
four boats shall be repaired concurrently. The period of performance shall be
84 calendar days after contract award. The place of performance will be as
provided in accordance with the statement of work. The contractor shall
maintain a facility in the Tidewater Va area. This requirement will be FOB at
designation. The following FAR provisions and clauses are applicable to this
procurement: 52.212-1, Instructions to Offerors - Commercial Items; 52.212-3
and its ALT I, Offeror Representations and Certifications. Certification and
Representations shall be submitted via ORCA website at
https://orca.bpn.gov/publicsearch.aspx Commercial Items; 52.203-3, 52.203-6,
52.203-6 ALT 1, 52.212-4, Contract Terms and Conditions - Commercial Items
52.212-5, Contract Terms and Conditions Required to Implement Statutes or
Executive Orders - Commercial Items. The following clauses are applicable to
this solicitation: 52.219-8, 52.222-3, 51.222-19, 52.222-21, 52.222-26, 52.222-
35, 52.222-37, 52.222-39, 52.223-9, 52.232-33, 52.233-3, 52.233-4. Additional
contract terms and conditions applicable to this procurement are: 252.212-7000
Commercial Items, Offeror Representations and Certifications : Certification
and Representation shall be submitted separately from the quote and 252.212-
7001 Contract Terms and conditions required to implement statutes or Executive
Orders applicable to Defense acquisitions of commercial items, The applicable
clauses are ; 252.232-7003. FAR clause 52.222-41, Service Contract of 1965,
as amended applies. The Wage Determination Number for this requirement is 2005-
2544 REV (1). The wage determination can be accessed via the DOL website at
http://www.dol.gov. The latest Wage Determination will be incorporated into
any contract resulting from this solicitation. Additional FAR Clauses are
52.232-37 and 52.233-2. Quoters shall include the quoter?s technical approach
and past performance information. All clauses will be incorporated by
reference in the order.

Central Contractor Registration (CCR). Quoters must be registered in the CCR
database to be considered for award. Registration is free and can be completed
on-line at http://www.ccr.gov/ .

All quotes shall include price(s), a point of contact, name and phone number,
business size, and payment terms. Quotes shall be no more than 20 pages in
total. 20 pages are defined as (10 sheets front and back, paper size 81/2 by
11 inches. Facsimiles will be accepted. Each response must clearly indicate
the capability of the quoter to meet all specifications and requirements.

52.212-2, Evaluation - Commercial Items is applicable to this procurement.
While price will be a significant factor in the evaluation of offers, the award
may not go to the quoter whose price is the lowest. The contract will be
awarded to the Quoter whose quote is most advantageous to the Government. The
factors order of preference is 1. Technical, 2. Past Performance 3. Price.
Technical and Past Performance when combined will be equal to price.

Past Performance information:
The quoter shall submit, as part of its quote, information on previously
performed contracts or on-going contracts that are similar to the statement of
work/item description in the solicitation performed for Federal, State or local
Governments, and for commercial firms. Information shall be provided on either
1) all such contracts within the past three years, or 2) the last three such
contracts performed, whichever is fewer, and shall be limited to the name and
address of the organization for which the product was supplied and services
were performed and the number (phone, fax or Internet) of a contact for each
contract listed. The quoter should not describe past performance history in the
quote. The information should include, however, discussion of any major
problems encountered on the contracts listed and the corrective actions taken
to resolve them. The information may also include a description of any quality
awards earned by the quoter. The Government reserves the right to obtain
information for use in the evaluation of past performance from any and all
sources including sources outside of the Government. Quoters lacking relevant
past performance history will not be evaluated favorably or unfavorably on past
performance. However, the quote of a company with no relevant past performance
history, while not rated favorably or unfavorably for past performance, may not
represent the most advantageous quote to the Government and thus, may be an
unsuccessful quote when compared to the responses of other quoters. The quoter
should provide the information requested above for past performance evaluation,
or affirmatively state that it possesses no relevant directly related or
similar past performance. The assessment of the quoter?s past performance will
be used as a means of evaluating the relative capability of the responder and
other competitors to successfully meet the requirements of the RFQ. The
Government will give greater consideration to the contracts that the Government
feels are most relevant to the RFQ.

To be considered by the agency, all quotes must be received by the Contracting
Officer no later than 1400 hours (Eastern Standard Time) on 08 Feb 2007. All
questions shall be sent to the Contracting Officer, LaVern Whitfield, at (757)
492-1340 or email whitfield_a@nsweast.socom.mil.

STATEMENT OF WORK


11 METER RIB EMERGENT REPAIRS

19 January 2007

1.0 Scope

The purpose of this action is to repair and/ or upgrade to 11 Meter RIBs NS83,
NS84, NS43, NS44 and Trailers in accordance with the Statement of Work.

2.0 Applicable Documents

Drawing USZA22-96-D-0006

3.0 Requirements

3.1 The Contractor shall, provide all personnel, materials, parts, equipment,
machining, and facilities necessary to conduct the required repairs,
maintenance or upgrade. The Government will remove the RIB engines prior to
the Medium mechanical repairs

3.2 RIB repairs may include removal of hull scratches and gouges, applying
ceram kote and armoroating to RIB components, installation of guide vane
chambers, windshields, storage bags, handrail covers and glad seals,
replacement of fuel bladders, bolster seats, tread master and ratchet straps
and preservation of water jets.

3.3 Trailer repairs may include sand blasting, painting and polishing to
trailer frame and components. Repair and or replace, remove and or install
flexible brake lines, leaf springs, tires, hubs, winch, bunk boards, air hoses,
glad hands, jack arm, hydraulic cylinder, air tank and lights.

3.4 The place of performance shall be identified either at the Contractors
facility or at the Special Boat Team provided facility. The place of
performance will be specified via the Contracting Officer two days prior to
start of repair.

3.4.1 If work is to be performed at the Special Boat Team, the Team will
provide: covered work area, compressed air and electrical power. The
Contractor shall provide all required tools and materials and shall follow all
directives of the Special Boat Team concerning safety, security and demeanor.

3 4.2 If work is to performed at the Contractors facility, the Contractor
shall be responsible for picking up the RIB(s) and trailer(s) for repair or
maintenance and delivering the repaired items back to the cognizant Boat Team.
The work shall be performed in contractor provided or owned facilities. The
contractor shall maintain a facility in the Tidewater, VA area. (SBT 20 is
located at 2220 Scholfield Drive, Norfolk, VA).

4.0 Description of task

4.1 First task 11M-RIB 83 and 84 Medium Level of Maintenance & Repairs Required

4.1.1 Trailer Repairs
Block trailer and remove all wheels
Support axles and disconnect "U" bolts holding axles to springs
Disconnect flexible brake lines at caliper and frame ends and drain brake fluid
from system
Remove bleeder fittings from each caliper assembly
Remove six (6) leaf springs and perches from trailer
Remove three (3) axles from trailer
Protect / remove brake components on axles prior to blasting
Sandblast axles, springs and spring perches to white metal
Paint axles and perches with gray CeRam Kote
Provide new "U" bolts, nuts, spring bolts, spring bushings and hanger bushings
from MYCO
Preserve external surfaces of springs with ZRC cold galvanizing paint
Reinstall axles and springs with new "U" bolts, nuts, spring bolts, spring
bushings & hanger bushings
Clean brass fittings on hose ends and reinstall
Provide and install new bleeder fittings
Fill brake system (DOT 5 fluid) and bleed air from lines
Polish aluminum wheels, fenders & stowage box and reinstall using anti-seize on
lug nuts
Power tool clean rusty spots on trailer frame and apply ZRC cold galvanizing
paint to preserve
Replace the winch, cable and hook
Replace the glad hand pairs of flexible air lines
Prepare and preserve master cylinder, tilt cylinder, hydraulic hose fittings,
hydraulic pump and reservoir
Prepare and preserve bunk brackets and trailer support wheel
Provide and install jack arm pin (1 each) and tilt pins (2 each)

4.1.2 Boat Repairs - Preservation
Remove the following metal components from boat for preservation:
Hold #1 hatch and frame; Hold #2 hatch and frame, Console hatch and frame
Console handrails (3 ea), battery tray, console terminal board plate, console
arch securing brackets
Water jet compartment hatches and frames, engine compartment hatch hinges, Comm
station plates,
Swim platform strut, swim platform backing plates, driveshafts, 3rd&4th row
slick bolster handrails, 2nd row
bolster handrail, 3rd row bolstewr handrail & mounts (5 ea), fuel priming
pumps, console DICP breaker
Bezels, Radar arch, ground plane, ground plane, engine box louvers, forward &
aft gun mounts, kingpost,
deck hydraulic protectors (8), Comm Box foundation
Blast all removed components to white metal
Apply CeRam Kote to all components
Remove and Reinstall 5 ea. bolster seat mounting brackets, blast, CeRam Kote &
reinstall
Reinstall all components using new hardware and pins
Prep and preserve the exterior of both water jets with Trilux 33

4.1.3 Boat Repairs - Hull & Topside
Remove sponsons (2 each) and bra
Repair hull scratches, gouges and nicks caused by trailering & other
miscellaneous damage (four square feet)
Repair nicks topside (two square feet)
Armor coat all repaired areas
Clean Hold #1, remove interferences, armor coat compartment completely and
reinstall interferences
Clean Hold #2, remove interferences, armor coat compartment completely and
reinstall interferences
Clean console interior deck, armor coat compartment completely
Armor coat bottom side of engine compartment hatches and around perimeter in
trough
Remove existing and provide and install all new engine compartment insulation
Provide and install SS ratchet straps & securing straps in Hold #2 (5 ea) & 72"
console securing strap
Provide and install new radar arch covers (2 each)
Provide and install port & starboard console bags
Provide and install GPS and Radar cover & track
Provide and install console splash shield
Provide and install new foam and covers for all handrails
Armorcote 3rd & 4th row slick bolsters
Strip down, prepare and Armor coat bolster frames and the 5 each bolster shells
Provide and install new velcro & edging and upholstery for bolster shells
Remove existing and reinstall tread master on forward deck & swim platform (GFE
Tread master)
Accomplish an all over buff of the boat

4.1.4 Boat Repairs - Mechanical
Provide and install a new acrylic scratch resistant windshield
Provide and install new DIN rails for the console terminal boards
Remove the steering nozzle, end bell and guide vane chamber from both jets
Report to unit any materials needing replacement
Shim impellers to provide proper clearance
Assemble jets
Drill and tap water jet bells for the zinc mod (ECP 82)
Install trim tab indicator cables (GFE cables)
Install GFE back flush cables and free up valves on port & starboard sides
Remove existing and install new GFE Racor water separators
Clean the terminals on all console terminal boards, switches and miscellaneous
components
Remove the battery parallel solenoid and recondition and reinstall
Replace blower hoses w/ new orange hose & alum vents

4.2 Second task 11M- RIB 43 and 44 High Level of Maintenance & Repairs Required

4.2.1 Trailer Repairs
Block trailer and remove all wheels
Support axles and disconnect "U" bolts holding axles to springs
Disconnect flexible brake lines at caliper and frame ends and drain brake fluid
from system
Remove bleeder fittings from each caliper assembly
Remove six (6) leaf springs and perches from trailer
Remove three (3) axles from trailer
Protect / remove brake components on axles prior to blasting
Provide new springs to replace defective units (6 each)
Sandblast axles and spring perches to white metal
Paint axles and perches with gray CeRam Kote
Provide new "U" bolts, nuts, spring bolts, spring bushings and hanger bushings
from MYCO
Preserve external surfaces of springs with ZRC cold galvanizing paint
Power tool clean and ZRC entire trailer frames
Provide & install all new reflective tape on trailers
Reinstall axles and springs with new "U" bolts, nuts, spring bolts, spring
bushings, hanger bushings
Provide & install new wheel bearing seals, wheel bearings, bearing races, disc
brakes pads, and brake hoses
Clean brass fittings on hose ends and reinstall
Provide and install new bleeder fittings
Fill brake system (DOT 5 fluid) and bleed air from lines
Polish aluminum wheels, fenders & stowage box and reinstall using anti-seize on
lug nuts
Provide new fender to replace unusable fender
Replace all bunks and recover with the new sailcloth material
Replace the winch, cable and hook
Replace the air flask with new
Replace the glad hand pairs of flexible air lines & stowage clips
Replace the forward wheel hydraulic cylinder
Prepare and preserve master cylinder, tilt cylinder, hydraulic hose fittings,
hydraulic pump and reservoir
Prepare and preserve bunk brackets and trailer support wheel
Provide and install jack arm pin (1 each) and tilt pins (2 each)
Provide and install new bow chock blocks

4.2.2 Boat Repairs - Preservation
Remove the following metal components from boat for preservation:
Hold #1 hatch and frame; Hold #2 hatch and frame, Console hatch and frame
Console handrails (3 ea), battery tray, console terminal board plate, console
arch securing brackets
Water jet compartment hatches and frames, engine compartment hatch hinges, Comm
station plates,
Swim platform strut, swim platform backing plates, driveshafts, 3rd&4th row
slick bolster handrails, 2nd row
bolster handrail, 3rd row bolster handrail & mounts (5 ea), fuel priming pumps,
console DICP breaker
bezels, Radar arch, ground plane, ground plane, engine box louvers, forward &
aft gunmounts, kingpost,
Deck hydraulic protectors (8), Comm Box foundation
Blast all removed components to white metal
Apply CeRam Kote, IAW mfg instructions, to all removed components
Remove and Reinstall 5 ea. bolster seat mounting brackets, blast, CeRam Kote &
reinstall
Reinstall all components using new hardware and pins
Prep and preserve the exterior of both water jets with Trilux 33 IAW mfg
instructions

4.2.3 Boat Repairs - Hull & Topside
Remove sponsons (2 each) and bra
Repair hull scratches, gouges and nicks caused by trailering & other
miscellaneous damage (six square feet)
Repair nicks topside (three square feet)
Armor coat all repaired areas to match base, IAW mfg instructions
Clean Hold #1, remove interferences, armor coat compartment completely and
reinstall interferences
Clean Hold #2, remove interferences, armor coat compartment completely and
reinstall interferences
Clean console interior deck, armor coat compartment completely
Armor coat forward vertical side of transom aft of 4th row slick bolster
Accomplish cleaning & Armor coat engine and waterjet compartments complete
Armor coat bottom side of engine compartment hatches and around perimeter in
trough
Remove existing and provide and install all new engine compartment insulation
Provide and install a new anchor chain bag in Hold #1
Provide and install SS ratchet straps & securing straps in Hold #2 (5 ea) & 72"
console securing strap
Provide and install hydraulic container bag in Hold #2
Provide and install new radar arch covers (2 each)
Provide and install foot pump bag
Provide and install port & starboard console bags
Provide and install GPS and Radar cover & track
Provide and install console splash shield
Provide and install Port & Starboard aft rope bags
Provide and install engine compartment stowage bags
Provide and install new foam and covers for all handrails
Provide and install 5 each bolster seat pad latch cover straps
Remove existing and reinstall all tread master and ensulite on entire deck (GFE
materials & Coxswain Flat Kit)
Replace foam in fuel cells (GFE Kit) (IAW ECP 148)
Armorcote 3rd & 4th row slick bolsters
Strip down, prepare and Armor coat bolster frames and the 5 each bolster shells
Provide and install all new uphostery for bolster shells w/ new velcro & edging
and uopholstery for slick bolsters
Remove main gauge panels (2 each) and replace with GFE
Prepare, sand and preserve throttle, bucket & gearbox bezels
Accomplish an all over buff of the boat
Reinstall sponsons

4.2.4 Boat Repairs - Mechanical
Provide and install a new acrylic scratch resistant windshield
Provide and install new DIN rails for the console terminal boards
Remove the steering nozzle, end bell and guide vane chamber from both jets
Report to unit any materials needing replacement (GFE)
Shim impellers to provide proper clearance
Assemble jets
Drill and tap waterjet bells for the zinc mod (ECP 82)
Replace control cables for throttle & shift
Provide and install the trim tab indicator cables (GFE cables)
Provide and install starboard back flush cable and free up valves on port &
starboard sides
Remove existing and install new GFE Racor water separators
Provide and install new COMM label plates (5 stations per boat)
Provide and install forward & aft spotlight connector caps and chains (2 each)
Accomplish testing of electrical system and submit results
Note: Electrical repairs and materials will be funded from the LOE below
Clean the terminals on all console terminal boards, switches and miscellaneous
components
Remove the battery parallel solenoid and recondition and reinstall
Replace blower hoses w/ new orange hose & alum vents
Remove existing HSRC valves, reseal and prep and paint and reinstall after
repairs
Power tool clean and preserve all hydraulic hose fittings


Company Reports

Get the Dun & Bradstreet Report for Other Defense Agencies, U.S. Special Operations Co
Company Information
 
Company Name:   Other Defense Agencies, U.S. Special Operations Co
Address:Login to view contact details
City:Login to view contact details
State/Province:Login to view contact details
Country:Login to view contact details
Zip/Postal Code:Login to view contact details
Phone:Login to view contact details
Fax:Login to view contact details
Contact Person: Login to view contact details
Email:Click here to send this company an email

Didn't find what you were looking for? Post a lead!

Click here to forward this trade lead to a friend!


Worldbid.com Affiliates